Turnberry House, Glasgow
Skip to Details
Description:
This project was for the refurbishment of a traditional Glasgow city centre office block entrance and reception foyer.
The status of the building and users required a high quality of finish and the materials used were granite flooring, Italian marble wall tiles and oak doors. In addition lighting installation was renewed and a flat screen tv installed.
The building was occupied throughout the works and access was required at all times. The team at Redpath carried out detailed co-ordination and planning to ensure the complete health, safety and wellbeing of all building users and site operatives was maintained at all times.
Key Facts / Information:
| Client | Steelmain Ltd. |
| Architect | Nord Architects |
| Location | Glasgow, City Centre |
| Duration | 8 weeks |
| Value | £45,000 |